Ethiopia’s Ministry of Finance has enacted the Federal Government-Owned Enterprises Procurement Execution Directive No. 1070/2025 (“the Directive”) pursuant to Article 87(3) of the Public Procurement and Property Administration Proclamation No. 1333/2024 (the “Proclamation”), marking another important milestone in Ethiopia`s procurement transformation, specific to enterprises owned by the federal government. Unlike all other public bodies in Ethiopia, these enterprises are established for commercial purposes and compete with the private sector. Therefore, the Directive specifically addresses the various characteristics of government-owned enterprises by establishing a specific and uniform procurement regime, which creates harmonization in the execution of procurement.
The Directive incorporates a uniform procurement framework for the full spectrum of the procurement process from planning to incorporation, tendering, contract administration, dispute resolution, and reporting misconduct under a single legal instrument. Under this piece, we will dive into the basic elements incorporated under the Directive.
- Participating Bodies and Their Respective Responsibilities
| No. | Relevant Authority | Major Roles and Responsibilities |
| Procurement and Property Authority | The Authority monitors the procurement performance of state-owned enterprises and conducts audits to ensure compliance with applicable laws and relevant procedures. It investigates misconduct against bidders or suppliers and takes appropriate legal action. The Authority also approves procurement manuals prepared by state-owned enterprises. | |
| State-Owned Holding Company or Regulatory Body | This body is responsible for leading the corporate governance framework for procurement in state-owned enterprises. It must ensure that procurement units are consistently structured according to their responsibilities and operational characteristics. Additionally, it supports state-owned enterprises in adopting modern procurement practices. | |
| Board of Directors of State-Owned Enterprises | The board shall evaluate investment and capital procurement budget execution reports and implementation of feedback and corrective actions recommended by internal audit units or audit subcommittees. | |
| Head of the state-owned Enterprise | The Head is responsible for ensuring qualified personnel handle procurement, monitoring procurement activities in line with approved plans, reviewing and approving evaluation reports, and establishing necessary procurement committees and teams. The Head also oversees contract signing and compliance, handles special procurement requests, and addresses supplier complaints. | |
| Procurement Unit | The Procurement Unit is responsible for preparing and submitting the annual procurement plan, coordinating procurements with third parties and other state-owned enterprises, managing the bid process, maintaining procurement records, and communicating bid outcomes. It oversees supplier assessments and registrations, conducts market surveys to inform procurement decisions, ensures supplier prices comply with procurement requirements, and prepares performance monitoring documents. | |
| Procurement Endorsing Committee | The Procurement Endorsing Committee reviews and approves the procurement evaluation reports and recommends corrections or cancellations. It ensures all decisions are reasonable, consults with the head of the enterprise on procedural improvements, and reports on procurement activities and challenges. | |
| Technical Committee | The Technical Committee, established by the head of state-owned enterprise, reviews technical documents according to bidding specifications, submits evaluation results to the procurement unit or committee, and develops technical standards as needed to ensure procurement meets technical requirements, and provides clarifications upon request. |
- Sustainable Procurement System and Ethics
Depending on the nature of the Procurement, Public Bodies may apply sustainable procurement, considering green procurement, recycling, total life cycle cost analysis, and the interest of society when developing specification and evaluation criteria, defining terms and conditions of the contract, as well as monitoring of contract performance. The Directive establishes a system for implementing sustainable procurement of state-owned enterprises. The Directive includes lifetime cost analysis as a sustainable procurement system and stipulates that the Authority will determine which procurement subjects require lifetime cost analysis, considering the specific nature of state-owned enterprises. And requiring bidders to submit both bid price and total lifetime cost (calculated as bid price plus operating, maintenance, spare parts, and disposal costs, less residual value), with the Directive clarifying that these cost estimations are solely for evaluation purposes and do not guarantee a related service contract. The lifetime of a good or construction work is determined according to the property management guidelines applicable to state-owned enterprises, and bidders are also required to provide supporting documentation to verify the accuracy of their lifetime cost information.
The Directive also requires state-owned enterprises to prioritize procurement with environmental protection considerations. Procurements must avoid environmental pollution, promote recycling, and contribute to community benefit., and can be achieved by: Incorporating environmentally friendly technologies, utilizing renewable energy sources, and establishing tender criteria that incentivize environmentally responsible manufactured products.Additionally, in the implementation of sustainable procurement, state-owned enterprises must consider the positive social, economic, and environmental impacts of their procurement on the local community.
Ethical considerations like confidentiality, fairness, and transparency are included in the Directive. All personnel (including heads, committee members, and bidders) involved in state-owned enterprise procurement must maintain confidentiality., fairness And all procurement activities must be conducted fairly and transparently. Anyone with a conflict of interest must recuse themselves with a written declaration as well.
- Procurement Planning in Federal Government-Owned Enterprises
The Directive establishes a clear and structured process for the preparation, review, and publication of the annual procurement plan. This places strategic procurement planning at the core of its compliance framework. This systematic approach is designed to ensure that the procurement activities are well organized, transparent, and aligned with the enterprise`s budget and strategic goals.
The Directive stipulates clear rules for the preparation, approval, revision, and disclosure of procurement plans, supported by project-level strategies, where feasible, and digital procurement systems.
- Annual Procurement Plan
State-owned enterprises must prepare an annual procurement plan that reflects the operational schedule, procurement needs, and approved budget allocations. The plan must contain:
- The type and method of procurement;
- Estimated value of each procurement;
- A clear description of the goods, works, or services to be acquired;
- The estimated cost, allocated budget, and source financing;
- The type of contract suitable for the procurement;
- A schedule outlining the timelines for the execution of major procurement activities; and
- Any other relevant information the state-owned enterprises consider necessary.
The plan must be approved by the head of the enterprise or, where applicable, the Board of Directors, no later than 6 August in the fiscal year. The Directive recognizes that procurement needs may evolve. Therefore, State-owned Enterprises are allowed to amend their procurement plans whenever it is necessary. Where procurement relates to a specific project, a separate project procurement strategy is required. This strategy is intended to ensure that the chosen approach in terms of procurement method, risk management, or contract type aligns closely with the project`s objective and market realities.
The transition towards electronic procurement is encouraged, though not mandated in full from the outset. While state-owned enterprises work towards complete adoption, they may conduct most procurement communications and exchanges through email or other electronic means. Until full digital capability is in place, certain processes like open tender announcements remain in traditional formats, while other interactions like communication and information exchange between state-owned enterprises and suppliers can be held electronically.
State-owned enterprises must keep a clear and complete record of the procurement. These records must contain the initial request through the final contract, in a manner that allows for effective oversight. Payment-related originals are to be retained by the finance department, with copies kept by the procurement department to ensure consistency and transparency in record management.
Transparency obligations require that major procurement results, excluding those legitimately withheld for security or confidentiality reasons, be made public within five working days of contract signature. This disclosure, typically through the state-owned enterprise website or other appropriate electronic channels, serves both as a measure of accountability and as a signal to the market of the enterprise`s commitment to fair and open competition.
- Pre-qualification Requirement
The Directive specifies criteria for eligibility and ensures only qualified and compliant suppliers, contractors, and service providers will engage in procurement processes. Eligibility requires that potential bidders are legally able to operate in the appropriate sector, have valid registration and licensing requirements, and meet any relevant regulatory or technical requirements specified in the goods, works, or services. Where applicable, this includes VAT or excise tax registration, submission of bid security, completion of the prescribed bid form, and proof of not being barred from public tenders are also mandatory.
The Directive further requires bidders to provide tax clearance certificates and proof of joint venture or consortium arrangements. An exemption is allowed for non-VAT registered suppliers to participate in one-time procurement that doesn’t exceed 500,000 ETB.
Disclosure of beneficial ownership is mandatory for all participating legal entities, partnerships, joint ventures, or Consortiums participating in a bid, except those listed on a securities exchange. Beneficial owners include any natural person who holds either directly or indirectly at least 10% of the shares or voting rights, effectively controls or holds a substantial influence or control of the bid, or has ultimate effective control. Bidders that inaccurately, incompletely, or falsely disclose this information will risk rejection of their bid submission and referral to proper authorities for legal action. Those meeting the prescribed requirements proceed to the detailed evaluation stage.
Bidders that fail to submit all the required legal documents will usually be disqualified; however, the process allows limited discretion in cases where the documents existed and were valid before the bid closing date, bidders may be permitted to submit the documents in the preliminary evaluation stage, if the authenticity of the document can be verified.
The integrity of the process is further ensured by a comprehensive conflict of interest policy. A bidder will be considered to have a conflict of interest where they remain undisclosed relationships with any entity’, or has links to other consultants, involved in the preparation of the bid documents, or giving consultancy about the bid, seeks to distort competition by soliciting input from third parties, submits more than one bid to the same bidding process (and has not provided prior notice of intent), shares the same representation as another bidder in the same bidding session, or has a business or family relationship with an employee of the procuring state owned Enterprises. The outcome of not having disclosed a conflict or any conflict of interest being discovered by the enterprise or relevant authority could be disqualification or termination of the contract.
Further, accountability provisions apply to former employees. A former employee or a family member, as defined by the Directive, may only participate in procurement if more than one year has passed since the individual departed from the enterprise. This restriction applies regardless of the procurement`s value or type, and aims to ensure fair competition in the procurement process. Former employees must disclose any potential conflicts of interest through the prescribed declaration form.
Together, these provisions provide that procurement opportunities are only open to entities that have demonstrated it has the capability, are a legitimate entity, and have integrity, while also ensuring transparency and competition in state-owned enterprises procurement.
- Qualification Requirements for Construction Procurement
The Directive establishes specific and comprehensive qualification requirements for construction procurement, reflecting the complexity and high value often associated with such projects. These requirements ensure that bidders with proven expertise, financial stability, and the necessary resources can participate.
- Technical and Professional Qualification
To ensure the quality of the construction projects, the Directive requires a thorough evaluation of the contractor`s past performance. State-owned enterprises may demand the Performance records of the contractor`s previously completed or ongoing construction projects. When such information is obtained from a third party, the state-owned enterprise must verify the bidder`s past performance during bid evaluation by reviewing contract documents and conducting site inspections. The Directive mandates that bidders for construction projects must be accompanied by a high level of technical and professional competence. Key requirements include:
- Registration and Licensing: the bidder must be legally registered and possess a valid license for the specific category of construction work they are bidding for.
- General Experience: Apart from contractors classified between grades 6-10 by the relevant government authority, all domestic contractors must have at least two (2) years of sector-specific experience. Foreign contractors must have a minimum of four (4) years of sector-specific experience.
- Relevant Experience: Domestic contractors must have satisfactorily completed at least one similar project (70% or more of the work) within the past ten years. For projects under three billion ETB, up to three projects can be combined to meet the total value requirement; for projects over three billion ETB, up to four projects can be combined.
- Foreign Contractor Relevant Experience: Foreign contractors must have completed at least two similar projects within the past ten years, with at least eighty percent (80%) of the work completed reliably and satisfactorily.
- Subcontracting and Joint Ventures: When a contractor`s experience is gained through a subcontracting or joint venture role, only the portion of the work performed by that bidder will be counted towards meeting the experience requirements.
- Availability of Key Personnel: The bidder must demonstrate that they have access to qualified key personnel, such as project managers, civil engineers, and foremen, who have relevant experience for the project. Financial Qualifications
The Directive places a strong emphasis on the financial capacity of bidders to successfully execute construction contracts.
- Financial Reports: contractors must submit audited financial reports covering a minimum of four years. For domestic contractors established for less than four years, Financial reports consistent with their commercial registration certificate or business license are accepted.
- Annual Turnover Amount: The annual turnover requirements are calculated based on the estimated project value and duration, with different multiplier factors:
- For domestic contractors: the required annual turnover is calculated by dividing the estimated construction project value by the projected construction period in months, rounded up to the next full month, and multiplying the result by 0.6. The highest annual turnover from the past five years is considered for evaluation.
- For foreign contractors, the multiplier factor is 2.0
- For joint ventures between domestic and foreign contractors, the multiplier is 1.2.
- Joint Venture Requirements: In a joint venture, each partner must meet 25% of the required turnover, while the lead contractor must meet a minimum of 40% of the required turnover.
- Pre-qualification Tender Execution
In certain procurements, the Directive mandates an additional procedural stage to verify the bidder`s capabilities before the issuance of full tender documents. Depending on the types of procurement, this applies to procurements of a specialized or complex nature.
State-owned enterprises may issue either a national or an international prequalification tender, depending on the procurement type. This approach is required in three principal scenarios:
- Where the procurement involves high or complex projects such as construction works, manufacturing equipment, or advanced information technology, requiring integrated design, production, and installation by a single contractor;
- Where goods or equipment are of critical importance, necessitating high-quality and functionality standards, and accompanied by installation services; or
- Where preparation of bidding documents entails significant expense, it is prudent to limit competition to bidders whose qualifications have been formally verified.
The pre-qualification notice must indicate the process being used and that the bidding documents must be in the appropriate standard form of bidding document. The prequalification criteria may differ depending on the type of procurement, but typically, bidders must provide evidence of relevant experience, sufficient human and material resources, and adequate production or construction capacity and track record in the delivery of similar contracts.
Following the evaluation process, the state-owned enterprise must notify all successful and unsuccessful candidates of the outcome. A positive prequalification is not a guarantee of a contract being awarded. If a candidate made a substantial misrepresentation in the proposal process or does not have the capacity after the post-qualification stage, the state-owned enterprise may choose not to proceed with signing the contract. Full tender documents will only be given to those candidates shortlisted after the pre-qualification process, and the procurement process will carry on through the national open tender process.
- Procurement Method
The Directive states four procurement methods for state-owned enterprises, such as Open Bidding, Selective Tendering, Limited Tendering, and Direct Procurement. Selective Tendering is further classified into three types: Two-Stage Bidding, Pre-Qualification Bidding, and Request for Expression of Interest. Similarly, Limited Tendering is categorized into Restricted Tender and Request for Quotation.
- Open Bidding
Open bidding is the primary procurement method for state-owned enterprises and is categorized as national or international. National open bidding requires fulfillment of specific conditions, including the procurement that can be fulfilled by domestic bidders. The estimated value thresholds are also provided in the Directive, for construction works, 3 billion Birr., for goods at 1 billion Birr, for consulting and non-consultancy services, 90 million Birr and 250 million Birr, respectively. Within these thresholds, procurement can proceed without participant restrictions, inviting all registered suppliers in writing or electronically after pre-qualification under strategic procurement. Importantly, if a state-owned enterprise is responsible for supplying construction materials, the construction material procurement threshold also applies to the procurement of construction work by that enterprise. The MoF can revise these thresholds based on prevailing conditions. National open bidding without thresholds is permitted when goods, services, or construction work are conofficeed to be available only within the country, when the state-owned enterprise head approves the procurement for better quality, time, and cost through a national tender, when an international open tender has been unsuccessful, or for construction materials required for state-owned enterprise construction work under contracts with third parties, due to strategic reasons.
International open bidding, another method categorized under open bidding. State-owned enterprises utilize international bidding if it is determined that the procurement would not be successful without the participation of foreign bidders. It shares similar estimated value thresholds with national open bidding. However, in international tenders for goods, non-manufacturing bidders must provide evidence that the goods originate from the manufacturer. Foreign bidders with local representatives must provide a legal power of attorney for that representative. The bid announcement and documents must be in English, and the call for tenders must be published in a widely circulated newspaper or through electronic means capable of reaching foreign bidders. Technical specifications should meet domestic standards and, to the extent possible, conform to international standards. In this method, foreign bidders bid prices and securities may be submitted in an easily convertible international currency or Ethiopian Birr and must include all applicable taxes, duties, insurance, transportation costs, and other related charges from the port of landing to the state-owned enterprise.
- Selective Tendering
Selective tendering includes three distinct sub-methods, such as two-stage bidding, pre-qualification tenders, and requests for expressions of interest, each designed to handle complex or specialized procurements. In a two-stage bidding, there are two stages: the first round and the second round. It shall be conducted in accordance with procedures established for national and international open bidding, depending on the type of procurement. In the first round of bidding, the bid announcement must clearly state that the procurement will proceed in two stages. In this stage or round the bidder is not required to submit bid security or price offers and the tender document prepared for procurement should reflect the overall requirements of the State Owned Enterprise and include necessary questions and statements that will enable the preparation of a detailed expression of interest based on the proposals submitted by the bidders, as well as criteria that will identify the bidders who will advance to the second round of bidding. Submitted proposals are then evaluated to determine suitable expressions of interest and select bidders for the next stage. The second stage involves those selected bidders submitting their bid guarantee and price, alongside their final bid proposal, using a dedicated tender document.
Pre-qualification tenders, another form of selective tendering, allow state-owned enterprises to preliminarily evaluate bidder qualifications for specific procurements. This is required for high-value or complex projects involving construction, manufacturing equipment, or IT that demand integrated design, manufacturing, and installation by a single entity. Pre-qualification criteria vary depending on the procurement type. State-owned enterprises may allow consortium or joint venture participation, but qualified individual bidders can’t submit joint bids unless the enterprise determines it won’t reduce competition. Once finalized and approved, pre-qualification results must be disclosed to all bidders, both successful and unsuccessful bids. The third selective tendering sub-method is the expression of interest tender, used by state-owned enterprises procuring consulting services exceeding 25 million Birr. It involves inviting potentially interested bidders to submit their expression of interest. The expression of interest notice must include project background, objectives, scope of work, and other relevant details enabling bidders to effectively express their interest.
- Limited Tendering
Limited tendering allows state-owned enterprises to solicit bids from a select group of suppliers without public advertisement, utilizing either restricted bidding or Request for Quotation (RFQ). Restricted bidding involves selecting a winner by comparing bids received following invitations sent in writing or electronically, without a public tender notice, adhering to national or international open bidding procedures, depending on the procurement type. It is permitted when the required goods, works, or services are available from only a limited number of suppliers, a previous attempt at open bidding failed, or when procuring location-specific services like hotels with enterprise head approval, regardless of cost, and also for vaccine or drug production inputs lacking effective competition and approved by the head. Even with a large number of potential bidders, restricted bidding may proceed if open bidding would not allow sufficient evaluation time or is deemed economically less advantageous, within the following financial limits: 100 million Birr for construction works, 25 million Birr for goods, 15 million Birr for consultancy services, and 20 million Birr for non-consultancy services. International restricted tenders, where effective competition necessitates foreign participation despite numerous potential bidders, can be conducted for procurements not exceeding 1.5 billion Birr for construction works, 500 million Birr for goods, 80 million Birr for consultancy, and 100 million Birr for non-consultancy services. Invitations and bid documents are provided in writing or electronically. When using restricted bidding, at least five candidates should be selected from the supplier list if feasible; if not, procurement can proceed with at least three. The state-owned enterprise shall not disclose bidder identities to competitors and may waive bid security to encourage competition.
The Request for Quotation (RFQ) method, another form of limited tendering, allows state-owned enterprises to quickly procure goods, works, or services for immediate use or those not suitable for bulk procurement, provided costs remain below certain thresholds. For one-time domestic procurements via RFQ, the thresholds are 8 million Birr for construction works, 4 million Birr for goods, 2 million Birr for consultancy, and 3 million Birr for non-consultancy. With foreign bidder involvement, these thresholds rise to 120 million Birr for construction works, 40 million Birr for goods, 15 million for consultancy, and 20 million Birr for non-consultancy services. When using a pre-qualified supplier list under a strategic partnership approach, RFQ can be used for up to 50 million Birr in construction works, 30 million Birr for goods, and 20 million Birr for non-consultancy. When a construction project requires specific materials with a reliable supply (like steel or cement), approved by the head of the enterprise, RFQ can be used for procurements up to 100 million Birr. In this method, bidders participating in the competition shall be selected from the list of suppliers registered by the state-owned enterprise or the relevant authority, and their number shall be as many as possible, not less than three. However, if no suppliers are registered, state-owned enterprises may proceed with procurement by inviting unregistered suppliers. And the enterprise keeps supplier identities confidential. And each bidder submits a single, unchangeable price quotation with uniform content and including all applicable taxes.
- Direct procurement
Direct procurement is the final state-owned enterprise procurement method. Upon approval of the heads of state owned enterprise, it may be used when procuring additional goods or services from a previous supplier at the same price, with supplier consent, in this case the value of additional procurement of goods, consultancy or non-consultancy services must not exceed that of the total value of the original contract and the additional procurement here must be ordered during the validity period of the original contract or within twelve (12) months from the completion date of the original contract and no price increment is allowed in this procurement beyond the unit price stated in the original contract unless there is an explicit statement in the original contract to do a price adjustment and such adjustment have been made. Additional or new construction works not initially anticipated can be executed by the state-owned enterprises, provided their value doesn’t exceed 40% of the original contract’s value. Direct procurement by special shopping may be carried out when the required goods or services or works are not available from regular suppliers or when the procurement would be economically beneficial to the state-owned enterprise, and by establishing an ad hoc committee to carry out the procurement, depending on the scale of the procurement. It can also be used when the enterprise’s special work nature prevents competition, for research/investigation needs, when confidentiality is required, or when procuring internationally recognized digital, branding, marketing, education/training services, or goods. Finally, direct procurement is permissible when difficulties arise in securing sufficient quantities of veterinary medicine production inputs, especially from limited domestic or foreign suppliers with long lead times.
- Bid Procedure and Procurement Approaches
- Procurement Approaches
The Directive acknowledges that procurement requirements for state-owned enterprises can be different from other public bodies due to their commercial emphasis, operation, and strategic objectives. In consideration of these realities, it endorses various procurement approaches other than the standard open tender process.
- Strategic Partnership Procurement
Strategic partnership procurement is employed where the continuity of supply, operational reliability, or strategic alignment requires established pre-qualified suppliers. Under this approach, state-owned enterprises register suppliers that meet pre-determined qualifications, then invite them all to participate in tenders, or award contracts directly for a defined period where appropriate. This approach is used when it is more advantageous in terms of time, cost, and quality, and is previously identified and approved in the procurement plan of the state-owned enterprise.
Supplier registration follows a competitive, transparent pre-qualification process, typically via national or international open tenders, with those meeting the criteria entered into an approved supplier list valid for two years. State-owned enterprises, when necessary, are required to re-verify supplier capacity periodically, ensuring that registered offices continue to meet the technical, financial, and operational standards initially demonstrated.
- Framework Agreement Procurement
Framework agreements allow state-owned enterprises to contract with one or more suppliers for the repeated supply of goods or services over a period of up to five years. This method is well-suited to high-volume, recurrent requirements where economies of scale can be achieved through bulk purchasing and standardisation.
Frameworks may be concluded with a single supplier or with multiple ranked suppliers, enabling flexibility in allocation where capacity limits, market volatility, or strategic considerations make sole-sourcing impractical.Allocation between multiple framework suppliers is governed by pre-established percentages, and all suppliers are required to provide performance guarantees proportionate to their contract share. Prices under framework agreements remain subject to price changes occurring 3 months after contract implementation begins. Additionally, it must be stated in the framework agreement, the price of goods or services is subject to price adjustment.
- Joint Procurement
Joint procurement enables two or more state-owned organisations to aggregate demand and conduct a single procurement process through an agreed lead enterprise. This approach can unlock significant cost advantages, harmonise technical specifications, and streamline supplier engagement in cases where enterprises share similar requirements.
While the bidding process is executed centrally, each participating state-owned enterprise retains contractual autonomy, entering into its own agreement with the winning bidder under the jointly agreed terms. The approach requires a formal joint procurement agreement and adherence to the bidding method, national or international, appropriate to the contract value and nature.
- Force Account Procurement
Force account procurement permits state-owned enterprises to execute construction works or services using their own resources, without an external tender. This includes small-scale or geographically dispersed works, projects in remote locations, urgent repairs in emergency situations, or instances where in-house delivery offers a clear quality or cost advantage.
The approach is capped at ETB 50 million per contract and generally excludes raw materials unless otherwise authorized by the enterprise’s board. For state-owned enterprises in the construction sector, the Directive permits the use of force account without a value threshold, provided the approach is justified and consistent with approved procurement plans.
- Turnkey Procurement
Turnkey procurement is a method whereby state-owned enterprises consolidate multiple procurement components, each of which could otherwise be tendered separately, into a single, comprehensive contract. This integrated approach is adopted when such consolidation offers demonstrable advantages in efficiency, cost-effectiveness, or project delivery.
Where construction works form part of a turnkey contract, supervision responsibilities may be undertaken either by a consultant engaged directly by the enterprise or, where appropriate, by a consultant nominated by the contractor, subject to the enterprise’s approval.Turnkey procurement must be conducted in accordance with bidding documents specifically designed for turnkey projects to ensure clarity, completeness, and effective contract administration.
- Electronic Reverse Auction Procurement
Electronic reverse auctions introduce a competitive, technology-driven process in which pre-qualified bidders submit progressively lower price offers within a set timeframe, with the lowest-priced compliant offer securing the award.
This approach is appropriate for goods or services that are clearly defined, widely available, and evaluated solely on price. It requires a sufficient number of suppliers in the market to ensure meaningful competition and is subject to the financial ceiling applicable to price quotation procurement under the Directive.
- Lease Agreement Procurement
Lease agreement procurement is applied when a state-owned enterprise opts to acquire the use of goods, equipment, or facilities through leasing arrangements rather than outright purchase. This approach allows enterprises to access necessary resources while optimizing cash flow, avoiding large upfront capital expenditures, and maintaining flexibility in operations.
Under this approach, lease terms must clearly define the duration, payment schedule, responsibilities for maintenance, dispute resolution methods, and termination. Evaluation considers not only lease rates, but also total lifecycle costs, performance guarantees, and the lessor’s capacity to meet operational requirements.
- Bid Procedure
The bidding process in state-owned enterprises follows a structured sequence designed to promote transparency, competition, and value for money. It begins with the advertisement of the bid, which must be issued through appropriate national or international channels, depending on the procurement method. The notice should clearly describe the procurement requirement, eligibility criteria, submission deadlines, and instructions for accessing the bidding documents. Where pre-qualification has been carried out, only those shortlisted will be invited to submit proposals.
Submission of Bids remains open from the date of invitation until the deadline specified in the notice. Bidders are expected to provide complete documentation in the prescribed format, together with bid security where required.
Bid opening is conducted at the date, time, and venue stated in the bid invitation. The process is open to bidders or their representatives, and may also be observed by auditors, ethics officers, and other authorized parties. Where both technical and financial proposals are submitted together, all relevant details, including bidder names, prices, discounts, and bid security, are announced. In two-stage processes, only technical proposals are opened initially, with financial proposals kept sealed until technical evaluation is completed. Minutes of the opening are prepared and shared with all participants.
Preliminary examination is undertaken immediately after opening to ensure that bids meet the mandatory requirements stated in the bidding documents. These include business licenses, tax clearance, VAT registration, bid security, and any other essential legal or technical documents. Minor omissions may be rectified if the document was issued before bid closing. But failure to submit key documents, such as bid security, leads to disqualification.
Detailed evaluation is then carried out on bids passing the preliminary stage. This may be based on the lowest evaluated price among technically compliant bids, or on a combined technical and financial scoring method where weightings are assigned in advance. In two-stage processes, the technical evaluation is finalized before financial proposals are opened, and unsuccessful bidders are notified of their results and allowed to submit complaints.
Where arithmetic errors are identified, they may be corrected with the bidder’s consent; refusal results in exclusion from the process. Bids are also reviewed for abnormally high or low prices against market benchmarks, with further clarification sought before acceptance.
Negotiations are permitted in limited circumstances, such as when a single bid is received, when the winning bidder withdraws, or when market conditions warrant a price adjustment. Such negotiations must be approved by the head of the enterprise and documented.
The evaluation report is submitted to the approving authority within the bid validity period. The authority may endorse the results, return the report for revision, or cancel the procurement. Any dispute between the approving body and the evaluation team is resolved in line with the Directive, with the decision of the head of the enterprise prevailing in final cases.
Before awarding the contract, the enterprise may carry out a post-qualification verification to conoffice that the selected bidder maintains the capacity, legal standing, and resources to perform the contract. If the bidder fails to meet the requirements, the next-ranked bidder is considered.
Bid results are communicated to all participants and published on the enterprise’s website or other official channels.The winning bidder receives a formal notification of award, which serves as an invitation to sign the contract, not as the contract itself. If the awardee refuses or fails to provide performance security, the enterprise may award the contract to the next-ranked bidder or initiate a new tender. Bid securities are released to unsuccessful bidders in accordance with the Directive.
- Contract Handling and Dispute Resolution
The Directive sets out comprehensive provisions for managing procurement contracts, covering contract formation, execution, price adjustment, payment, and closure. All procurement contracts must be executed in writing and reflect the mutual agreement between the procuring state-owned enterprise and the supplier. Becoming effective upon signature by both parties. Contracts must incorporate standard bidding documents, resolution mechanisms, and provisions for amendment.
The state-owned enterprise must verify supplier eligibility, conoffice competence with the requirements of the procurement type, volume, and contract value before signing the contract. The state-owned enterprise will obtain performance guarantees of no less than ten percent (10%) of the contract value within 10 days from the signing date.Advance payments up to thirty percent (30%) of the total contract value may be made, A separate agreement shall be made regarding the use of the advance payment. The contractor may allocate sixty percent (60%) for road work and thirty percent (30%) for building work, according to the advance payment agreement. Advance payments made to suppliers will be deducted from the stage-by-stage interim payment certificates or delivery accounts.
All Amendments must be made in writing, signed by both parties and their authorized representatives, and incorporated into the contract to take effect. Price adjustments are allowed for construction contracts lasting 1 year or more and for non-consultancy procurements lasting 6 months or more. The items or supplies that are eligible for price adjustments should be specified in the bidding documents by the state owned enterprise. If the price adjustment exceeds twenty percent (20%) of the contract value, it requires approval from the state-owned enterprises.
Contracts must detail delivery quality, and the state-owned enterprises will accept goods or services after verifying the quality set out in the contract. Payments for goods and services by the state-owned enterprise are subject to compliance verification. Contract closure occurs only after conofficeing full delivery of goods or services, monitoring guarantees, settlement of payments and obligations, including those involving insurance companies, transporters, customs authorities, and banks. In cases of Supplier delay in contract execution, liquidated damages apply, calculated at 1/1000 of the contract per day, not exceeding 10 % of the contract value, after which the state-owned enterprise may terminate the contract. Grounds for termination include supplier nonperformance, legal or economic constraints, or force majeure events (e.g., natural disasters, war, or government prohibitions), explicitly distinguished from non-qualifying causes such as price increase, new legislation, or labor strikes.
All communications must be in writing. Disputes should first be resolved through dialogue, and if unresolved, through alternative dispute resolution, such as arbitration or in accordance with the terms of the contract.
- Compliant Handling in State-owned enterprises Procurement
A candidate can file a complaint with the state-owned enterprise head if they believe the procurement process violated the law, Directives, or bidding document terms, and they have suffered or are likely to suffer damages. Complaints must be submitted only before the state-owned enterprise enters a contract with the winning bidder. However a compliant submitted after a conclusion of a contract with state owned enterprise may be considered if the contract was signed before the deadline for submitting complaints, when the contract was signed after the announcement of the bid result or after the state-owned enterprise responded to the submitted complaint, but before the lapse of five (5) working days from the date of the response or result disclosure and when the contract was signed without the disclosing the tender result to the bidders. These are the exceptions that exist in the Directive regarding the complaint made after the conclusion of a contract. Complaints must be submitted within five working days of the decision forming the complaint’s basis being officially known or knowable, and late submissions are rejected. If the complaint is conofficeed as timely, the procurement process is suspended until a decision is made. The enterprise head must issue a decision within seven working days and provide a copy to the complainant.
This article is general information and not legal advice. Contact us about your specific situation.